Design and Execution of Investment Projects
The Authority is currently conducting studies and preparing design works and engineering specifications for various locations elected for investment in Phase II of MMR waters at Jefara Plain, Jabel Gharbi and Water System Routing Area Regions. Design works of some locations have already been accomplished. Other locations works are under process. Implementation follows design phase. A time schedule for these phases was prepared synchronized with the water schedule to reach these projects according to this plan; the engineering design and final drawing were completed in the following projects:
1. Garhabuli Agricultural Project.
2. Expansion of Garhabuli Project in Sidi El- Saeh Region.
3. Tarhouna Agricultural Project.
4. Abu Aisha Agricultural Project.
5. Tarhouna –Abu Zayan Conveyance System.
6. Jabel Gharbi Conveyance System ( Abu Zayan – Al-Rheibat).
7. Tripoli- BirTirfas Conveyance System.
8. Wadi Al-Hay Agricultural Project.
9. Bir Tirfas Agricultural Project.
10. Al Hira Agricultural Project.
11. Wadi Mjenin Agricultural Project.
12. Wadi Tajmoot Agricultural Project.
13. Al Dafinia & Naema Agricultural Project.
14. Tummina & Al Krarim Agricultural Project.
15. Suf Aljeen Agricultural Project.
16. Grarat Alqataf Agricultural Project.
17. El-Khums Farm.
18. Ganduba Project.
19. Pastoral Tanks.