Economic and Technical Feasibility Study
(To invest Water System at regions of Jabel Gharbi and Water System Branch Area)
The Authority has conducted the economic and technical feasibility study for 18 locations at “ Jabel Gharbi and Water System Routing Areas “ regions . Which are not included in the Agricultural Master Plan. In order to specify the best possible utilization of water at the Project locations of projects in Jabel Gharbi and Water System Routing Areas.









